#81862: "Contracts"
Sobre qué é este informe?
Qué aconteceu? Por favor selecciona debaixo
Qué aconteceu? Por favor selecciona debaixo
Por favor revisa se xa hai un informe sobre o mesmo tema
De ser afirmativo, por favor VOTA por este informe. Aos informes con máis votos se lles da PRIORIDADE!
| # | Status | Votes | Game | Type | Title | Last update |
|---|
Descrición detallada
-
• Por favor, copia e pega a mensaxe de erro que ves na túa pantalla, se houbera algún.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Por favor, explica o que querías facer, o que fixeche e o que pasou
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • Cal é o teu navegador?
Google Chrome v109
-
• Por favor, copia/pega o texto amosado en inglés no canto do teu idioma. Se tes un pantallazo deste erro (boa práctica), podes usar Imgur.com para subilo e copiar/pegar a ligazón aquí.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• É este o texto dispoñible no sistema de tradución? Se é así, foi traducido fai máis de 24 horas?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • Cal é o teu navegador?
Google Chrome v109
-
• Por favor explica a túa suxestión de maneira precisa e concisa para que sexa o máis sinxelo posible entender o que queres dicir.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). • Cal é o teu navegador?
Google Chrome v109
-
• Qué había na pantalla cando se quedou bloqueado? (mensaxe de erro?, pantalla en blanco?, unha parte da interface do xogo?)
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). • Cal é o teu navegador?
Google Chrome v109
-
• Qué parte das regras non se cumpriron na adaptación da BGA?
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• é visible a violación das regras na repetición? Se o é, en que número de movemento?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • Cal é o teu navegador?
Google Chrome v109
-
• Qué acción de xogo querías realizar?
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Qué é o que tratache de facer para activar esta acción do xogo?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). -
• Qué sucedeu cando o fixeche (a mensaxe de erro, mensaxe na barra de estado do xogo, ...)?
• Cal é o teu navegador?
Google Chrome v109
-
• En que paso do xogo ocorreu o problema (cal foi a instrucción actual do xogo)?
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Qué sucedeu cando tratache de facer unha acción de xogo (mensaxe de erro, mensaxe na barra de estado do xogo, ...)?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • Cal é o teu navegador?
Google Chrome v109
-
• Por favor, describe o problema de visualización. Se tes un pantallazo deste erro (boa práctica), podes usar Imgur.com para subilo e copiar/pegar a ligazón aquí.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). • Cal é o teu navegador?
Google Chrome v109
-
• Por favor, copia/pega o texto amosado en inglés no canto do teu idioma. Se tes un pantallazo deste erro (boa práctica), podes usar Imgur.com para subilo e copiar/pegar a ligazón aquí.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• É este o texto dispoñible no sistema de tradución? Se é así, foi traducido fai máis de 24 horas?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • Cal é o teu navegador?
Google Chrome v109
-
• Por favor explica a túa suxestión de maneira precisa e concisa para que sexa o máis sinxelo posible entender o que queres dicir.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). • Cal é o teu navegador?
Google Chrome v109
Historial de informes
The elevation granted by the contract was automatically build because there was only one place available.
Contract rewards are not mandatory.
The conduit granted by the contract was automatically built.
When there isn't only one place available, there is an option to skip building the structure. It should always be an option.
Engade a este informe
- Outro DI de mesa / ID de movemento
- Premer F5 resolveu o problema?
- Apareceu o problema varias veces? Tódalas veces? Aleatoriamente?
- Se tes un pantallazo deste erro (boa práctica), podes usar Imgur.com para subilo e copiar/pegar a ligazón aquí.
